Statutory fees

Planning Fee Calculator Help

Estimate statutory planning application fees using identified UK schedules or build a source-recorded US local-authority worksheet.

How to use the Planning Fee Calculator

Confirm the application jurisdiction and type, the current official fee schedule, measurable quantities and any exemptions or surcharges before relying on an estimate.

The workspace starts blank. Load example temporarily fills the controls with demonstration data; reload or use the tool’s New or reset action, where provided, before entering live information.

  • For a UK calculation, choose Area input units, UK Nation and Application Type, then enter only the quantity fields shown for that category.
  • Review the calculation trace, matched fee schedule and any entered full-application equivalent or exemption assumptions.
  • For a US worksheet, record the city or county, published schedule and edition, official URL and checked date before adding fee items.
  • Add contingency or surcharges only when they are separately identifiable, then confirm the final amount directly with the authority.

Worked examples

These examples explain the set-up, expected output and review needed without changing the tool workspace.

UK extension fee estimate

Set-up
Select the correct nation and application category, enter the measured floor-space or dwelling quantities requested, and retain the plan revision used.
Result
The estimate shows the matched rule and arithmetic rather than only a total.
Review
Confirm category, exemptions, transitional provisions and payment requirements on the relevant authority service before submission.

US local-authority worksheet

Set-up
Enter the authority, fiscal-year schedule, official URL and checked date, then transcribe each applicable base, review or technology fee as a separate item.
Result
The worksheet provides a source-recorded estimate with any contingency visible.
Review
Ask the authority to confirm which departmental and pass-through charges apply to the actual scope.

Suggested workflow

Place the tool in a controlled project or practice process rather than treating its output as an isolated verdict.

  • Classify the proposal and measure the required quantities from a controlled source.
  • Build the estimate from the current official schedule while exposing assumptions and additions.
  • Obtain the authority’s final fee and retain the payment or submission confirmation with the application.

Check before saving or issuing

  • The selected jurisdiction and application type match the submission being prepared.
  • Area conversions and dwelling counts are traceable to the current proposal.
  • The source URL, edition or effective date and any manual fee items are recorded.

Common problems

  • No meaningful result appears: complete the category-specific quantity fields after selecting the application type.
  • The authority quotes a different total: compare exemptions, caps, surcharges, local services and the schedule effective date.
  • A US worksheet looks authoritative without a source: add the official schedule URL and checked date before sharing it.

Output

An estimated application fee with calculation trace, source and assumptions.

Professional boundary

Confirm the final fee, exemptions and local requirements with the relevant planning authority before submission.